Specialists in Building Services Engineering
Swis Resources offers mechanical, electrical and plumbing engineering for all types of buildings, transportation facilities and industry projects according to our clients’ specific requirements. We work in close collaboration with the entire project team, ensuring optimal integration of all systems.
We design buildings for people and consult closely with building developers, owners and users to fully understand the purpose of each building. We create attractive, environmentally responsible, high-performance buildings that are safe, healthy and comfortable for occupants, while being easy to maintain and less costly to run. We ensure that our buildings meet today’s requirements, while having the flexibility to adapt to future needs.
MEP Engineering for Industrial Buildings
Our experts prioritize resource-efficient technologies to minimize energy and water consumption such as renewable energy, passive cooling, grey water recycling, combined heat and power solutions and intelligent control systems. Our designs regularly exceed the requirements of local building standards.
Swis Resources’ team of Malaysia-leading experts in MEP design for industrial buildings have been providing building systems consultancy for many well-known companies and goverment agencies in Malaysia, including Petronas, Sapura Kencana and Jabatan Perdana Menteri. Our MEP engineers have also worked on projects such as Petronas Penapisan in Melaka, Malaysia Marine And Heavy Engineering Holdings Berhad in Kuala Lumpur, and PRPC Utilities and Facilities in Pengerang, Johor.
Our Completed MEP Projects
CLIENT | DESCRIPTION | YEAR |
---|---|---|
SERBA DINAMIK SDN BHD | Design, Construction, Testing and Commissioning of Interconnection Facilities for FELCRA Seberang Perak, BIOGAS PLANT PROJECT FELCRA SEBERANG PERAK, PERAK Service and Maintenance for Biogas Plant- Felda Kahang, Johor | 2020 |
RAPID PMC | Construction and Commissioning of 33kV Permanent Power Supply to Temporary Camp Facility (TCF) for Refinery and Petrochemicals Integrated Development (RAPID) Project | 2019 |
OUI JV / PRPC UTILITIES AND FACILITIES SDN. BHD. RAPID, PENGERANG | Utilities, Interconnecting, Offsite (UIO) Facilities: Temporary Power Supply Services – Scope A – UIO East (Package 14 - SS32A) | 2018 |
Pusat Data Sektor Awam - MAMPU Jabatan Perdana Menteri | MEREKA BENTUK, MEMBEKAL, MENGHANTAR, MEMASANG, MENGKONFIGURASI, MENGUJI DAN MENTAULIAH CLOUD PUSAT DATA MELIBATKAN SISTEM RANGKAIAN SERTA KESELAMATAN, PERALATAN DAN PERISIAN TEKNOLOGI MAKLUMAT DAN KOMUNIKASI (ICT) TERMASUK MENYELENGGARA SECARA KOMPREHENSIF DALAM TEMPOH JAMINAN BAGI PUSAT DATA SEKTOR AWAM (PDSA) DI BANGUNAN BUSINESS CENTRE II, KULIM HI-TECH PARK, 09000 KULIM, KEDAH DARUL AMAN | 2018 |
Leader Solar Energy II Sdn Bhd | Design, Installation, Testing and Commissioning of 33kV Aluminium XLPE 630m2 Single Core Underground Cable & Accessories and Extension Works at TNB PMU Sungai Petani Industri | 2018 |
OUI JV / PRPC UTILITIES AND FACILITIES SDN. BHD. RAPID, PENGERANG | Utilities, Interconnecting, Offsite (UIO) Facilities: Construction And Commissioning (CC) Of 275kV Cable Laying, Jointing And Termination At Gas Insulated Switchgear (GIS) (Package 14- 1100) Rental Service for Junction Box and 50Kva Generator Set for Motor Preservation and Space Heating | 2017 |
PETRONAS PENAPISAN (MELAKA) SDN BHD | Supply and Delivery Pneumatic Stopper | 2016 |
DAYANG ENTERPRISE SDN BHD / PCSB | Supply and Delivery Pipes for Bardegg 2 Project | 2016 |
PBJV GROUP SDN BHD | Supply and Delivery Fittings for Kinabalu Project Supply and Delivery MCT Frame and Consumable Items | 2016 |
TOYO ENGINEERING AND CONSTRUCTION / IDEMITSU | Supply, Delivery, Install, Testing and Commissioning for LV MCC Modification Works for ISM E305 Project. | 2016 |
SCIENCES TECH SOLUTIONS SDN BHD | Rental and Cabin Equipment Provide Cold Cuttings & Bevelled Cutting Services. | 2016 |
TOYO ENGINEERING AND CONSTRUCTION / PMCSB | Supply and Delivery 2 Years Spare Parts for DALAK Project | 2016 |
Pusat Data Sektor Awam - MAMPU Jabatan Perdana Menteri | MEREKABENTUK DAN MEMBANGUN INFRASTRUKTUR PUSAT DATA SERTA MEMBEKAL, MEMASANG, MENGUJI, MENTAULIAH DAN MENYELENGGARA PERALATAN INFRASTRUKTUR PUSAT DATA DI KOMPLEKS PENDIDIKAN NILAI, BANDAR ENSTEK 71760 LABU, NEGERI SEMBILAN | 2016 |
ANUGERAH KECAPAIAN SDN BHD / PETRONAS DAGANGAN BERHAD | Supply and Delivery Compound Lighting | 2016 |
EPOMS/LUNDIN | Provision of Manpower, Tools, Material and Equipment for Explosion Proof (Ex) Equipment Inspection for Bertam Wellhead Platform | 2015 |
PETRONAS PENAPISAN (MELAKA) SDN BHD | Supply and Delivery of Flange Supply and Delivery of SS 318 Duplex Plug Supply and Delivery of Gate Valve: 1) 6”, 600LB, BW,CS, SCH 80,API600 2) 8”, 600LB, BW,CS, SCH 80, API600 Supply and Delivery of Flanges and Fittings | 2015 |
SAPURA KENCANA HL | Supply and Delivery Electrical and Instrument Cable | 2015 |
ANUGERAH KECAPAIAN SDN BHD | Supply and Delivery Cable Gland c/w Accessories | 2015 |
CIRCULITE ENGINEERING SDN BHD | Supply and Delivery Motor Relay | 2015 |
PETROFAC | Supply and Delivery Cable Tray for FPSO Lifeboat | 2015 |
PBJV GROUP SDN BHD | Supply and Delivery of Fittings | 2015 |
DAYANG ENTERPRISE SDN BHD | Supply and Delivery of Flange & Fittings for 1st PROIRITY LINE - for BARDEGG PROJECT Supply and Delivery of Electrical Material Inclusive of Provide Calibration Services for Thermal Overload Relay for SEPAT- MOPU | 2015 |
TALISMAN MALAYSIA LIMITED | Supply and Delivery of Stahl Small Fuse Base | 2015 |
BEST WIDE GROUP | Supply and Delivery of : 1) Check Valve, 1”, 1500LB,S316L 2) Globe Valve,3/4”,1500LB, S316L | 2015 |
Alam Flora Sdn Bhd | Construction of ELV Yard at Batu Muda Depot, Kuala Lumpur | 2015 |
SAPURA KENCANA ENERGY PENINSULA MALAYSIA INC. | Supply and Delivery of Power Cable (3C X 2.5mm), Power Cable (2c + PE X 4.0mm) and Cable Gland M20 BRASS ELECTROLESS | 2015 |
YOKOGAWA KONTROL (M) SDN BHD | Supply and Delivery CU/XLPE/LSHF/SWB/LSHF,600/1000V, IEC332-3-22 (21C X 2.5mm2) | 2015 |
PC METHANOL SDN BHD | Supply and Delivery of Flanges and Fittings Supply and Delivery of Pipes | 2015 |
PETRONAS CARIGALI SDN BHD | Supply and Delivery of Insulation Tester (Megger Tester) | 2015 |
TRANSWATER API SDN BHD | Supply and Delivery of GRP Panel | 2015 |
TANJUNG LANGSAT PORT | Supply and Delivery Safety Helmet Supply and Delivery 3 Way Collecting Box | 2015 |
PETRONAS CARIGALI SDN BHD/ DERMAGA | Supply and Delivery HMD Pump for SMP- A Project Overhaul Sampling | 2015 |
FELDA EGINEERING SDN BHD | To Supply, Delivery To Site, Fabrication, Construction, Site Erection, Installation Completion, Testing, Commissioning And Guarantee Of All Civil, Mechanical And Electrical Works For Fire Fighting System | 2015 |
SAMSUNG E&C / PETRONAS | Supply and Delivery Cable Ladder and Cable Tray complete with accessories for TGAST Project | 2015 |
ASEAN BINTULU FERTILIZERS SDN BHD | Supply and Delivery of Flanges and Fittings | 2015 |
MLNG SDN BHD | Supply and Delivery of Flanges | 2015 |
TOYO ENGINEERING AND CONSTRUCTION | Supply and Delivery of Air Filter Regulator Supply and Delivery of Conduit Box and Adaptor Supply and Delivery of Cable CU/XLPE/OSCR/LSHF/SWB/LSHF, 500V, IEC 60332-3-22 Supply and Delivery of Cable Gland complete with Accessories Supply and Delivery of Cable 3C | 2014 |
TOYO ENGINEERING AND CONSTRUCTION / PCSB-PMCSB | Supply, Delivery, Testing and Commissioning of MV Switchgear and MCC Modification Work complete with other accessories and retalated to the modification worksfor DALAK Pipeline Project. | 2014 |
SARAWAK SHELL PETROLEUM | Supply and Delivery of Cable Ladder | 2014 |
PETRONAS CARIGALI SDN BHD | Supply and Delivery of Solenoid Valve 4 Way Supply and Delivery of Gate Valves, 8”, Class150, RF, CS Supply and Delivery of DBB Valves, 2x2” 600# ½” SS316 | 2014 |
SABAH SHELL PETROLEUM COMPANY LIMITED | Supply and Delivery of 1” 600# Blind Spacers | 2014 |
MLNG SDN BHD | Supply and Delivery of Pipes: 1” SCH160, 2” SCH 40 A33-6 | 2014 |
DAYANG ENTERPRISE SDN BHD | Supply and Delivery of Flanges: Size 1” - 6” Rating 1500# - 2500# | 2013 |
PETRONAS CARIGALI SDN BHD/ DERMAGA | Supply, Delivery, Testing and Commissioning of Automated Crude Oil Sampling System together with pipe modification for SEMARANG-A Platform Expansion Project | 2013 |
PETRONAS DAGANGAN SDN BHD | Supply and Delivery of Analyzer – Hydrometer | 2013 |
HYUNDAI ENGINEERING | Installation of piping systems for PRR2 Rejuvenation and Revamp Project at GPP-A | 2013 |
MMHE | Telok A & B Offshore Topside Piping and Mechanical Works. Fabrication, Installation, Testing and Commissioning including offshore works | 2012 |